Q COSTARICA — Traffic is getting snarled around the bridge over the Tárcoles River, the famous ‘crocodiles bridge’, along the Costanera (ruta 34), with drivers losing up to 10 minutes or more in delays.
Still, the Ministry of Public Works and Transportation (MOPT) says the reinforcement work is absolutely necessary.
The MOPT pointed out that the bridge is seriously worn down—a fact backed up by technical studies from LanammeUCR and other experts.
To make the repairs, MOPT has partially closed the bridge, causing major traffic jams and significantly impacting tourism and local businesses.
“We know the traffic controls have led to delays during certain times,” MOPT said. “But our monitoring shows these slowdowns aren’t constant—mostly just during rush hours—and usually last less than 10 minutes.”
They stressed the disruption is only temporary, but it’s crucial to act now to avoid a possible collapse.
If the bridge fails, it would cut off the Pacific coast route, disrupting tourism, freight shipments, and the daily commute for thousands.
The catch is that the area sees a lot of traffic and tourists, so the repairs are causing real headaches for everyone.
Source link
Rico